Following the erection of an internal birdcage, an access lift and staircase to the roof level are now in place for the installation of roof and glazing panels at the new secondary school in Greenwich, Thomas Tallis.

Pictured above is a loading bay that is currently under construction for fork-lifting plaster board to the first and second floors of blocks A and B of the building.

Designed to house 1,950 pupils, the new school will include a gymnasium designed for use by British Gymnastics and the British Judo Association, and will be recognised as a 2012 Olympic training base camp.

There are no tags on this post.

Share this article:

Get in touch

Our services are offered to the top companies in the construction industry which include scaffolding, construction hoists and towers.

Contact Us

Get in touch