Our works at Heathrow T5C are ongoing. Pictured below are designed independent scaffolds with lifting points to allow CMF (Custom Metal  Fabrications) to install extra steelwork.

The access was provided for a design change and our  scaffold allowed for steelworks to be installed without removing the existing wall.

Tags on this post: airports

Share this article: