At Dubai’s Creek Vistas Reserve project headed by Sobha Construction, Brogan Group have added the SC10000, the strongest drive unit among our ever-growing collection of Mast Climbers.

Securing its nickname the ‘Beast’ it has a vast span across the residential building, allowing the façade team to install large aluminium composite panels more efficiently on the 33-floor building.

With a payload capacity of 10.2 Tonnes and a max height of 500m (over 60% the height of the record-breaking Burj Khalifa) the ‘Beast’ joins a combination of Brogan twin and single double stacked machines with added cantilevers, designed by our in-house team to fit the multidimensional exterior.

Mast Climbers are a cost-effective alternative to scaffolding when hire periods are below 35 weeks and can reduce access time by as much as 90%.

The tower is estimated to be complete by Q1 2023.

 

 

To keep up to date on the latest Brogan Group news follow us on LinkedIn

Tags on this post: mast climbers

Share this article: